Well drilling in Washington: notices, licenses, and how to read a well report
What state agencies actually require before a water well is constructed, how to confirm a driller’s license, and what an official well report does — and does not — tell you. This page does not invent per-foot drilling prices.
Licenses
In Washington, well construction is a licensed occupation under the state well-construction program (chapter 18.104 RCW and chapter 173-162 WAC). Ecology’s Well Construction & Licensing System is the official public tool to search for licensed drillers, drilling companies, and notices of intent. Ecology states that “the information viewed is only as accurate as the information received.”
Confirm a current operator license in the Licensed Driller Search before you hire. The drilling company must also hold a contractor registration with the Department of Labor & Industries. A name on an old well report is not proof that the same person is still licensed.
Ecology does not recommend particular drillers. County directories on this site list drillers only when they appear on a cited official public roster; Ecology’s license search is a query form, not a downloadable county list.
Notice of intent (start card)
Well drillers file a notice of intent to construct a well, often called a start card. Ecology’s official page says the notice must be submitted 72 hours before drilling starts. WAC 173-160-151 uses the same 72-hour minimum and says the property owner, the owner’s agent, or the water-well operator shall notify the department.
Ecology is explicit about what an NOI is not: it is “not a permit, certificate, or application for a water right,” and it “does not represent approval or permission to use water from the well.” Water may be withdrawn later only if it is legally available, and the well must be put to beneficial use to establish a right to use the water. See also the water-use section of Buying rural land with a well and septic.
Under WAC 173-160-151, the notice must contain:
- Well owner name
- Well location, including street address, county, 1/4, 1/4 section, township and range, and tax parcel number
- Proposed use (if the intended withdrawal requires a water right, the permit or certificate must be attached)
- Approximate start and completion dates
- Contractor registration number
- Operator or trainee name and license number
- Drilling company name
In an emergency or public-health emergency, the rule allows verbal notice to the appropriate regional office, with the written notice and fee submitted within 24 hours. If drilling equipment leaves the site, a new notice and fee are required for follow-up construction. Notices can be submitted and paid online; paper forms can be requested from Ecology at wclo@ecy.wa.gov, as stated on the official NOI page.
Search help for well reports explains the letter prefix on an NOI number: W for a water well, R for a resource well, S for a soil-boring well, D for a dewatering well, A for a decommissioned or abandoned well, E for an environmental test sample where no casing is left in the ground, and G for a ground-source heat loop or grounding well. There may be more than one well report for a single start-card number.
Fees published in state rule
WAC 173-160-151 requires the notice to be accompanied by fees that apply to all newly constructed or altered wells. As published in the official Code Reviser PDF certified on 2/20/2023:
| Work described in the rule | Fee stated in the rule |
|---|---|
| One water well, other than a dewatering well, with a top casing diameter of less than twelve inches | Two hundred dollars (this fee does not apply to a ground-source heat pump boring or a grounding well) |
| One water well, other than a dewatering well, with a top casing diameter of twelve inches or greater | Three hundred dollars |
| Decommissioning a water well | Fifty dollars |
The same section also sets separate fees for ground-source heat-pump borings, grounding wells, and dewatering systems, and it describes refunds if a well has not been constructed and a written request is submitted on an approved form within six months. This site does not treat those figures as a bid for drilling work. They are filing fees, not construction prices. Ecology’s NOI page adds that payments made with a credit or debit card are charged an additional 3 percent fee, while electronic-check or direct-account-withdrawal payments are not.
How to find and read a well report
A well report (well log), in Ecology’s words, “is used to describe the location, ownership, construction details, and lithology for either a completed resource protection or water supply well.” It is completed and signed by the individual who constructs the well and must be submitted to Ecology within 30 days after completion.
When you open a report — or the text or map search results drawn from it — Ecology says you can expect information about:
- Location (often by township, range, and section; street address may appear on the report image but is omitted from some bulk exports)
- Owner name
- Driller name
- Construction details and lithology (the materials encountered while drilling)
- The quantity of water the well produces
Use those fields as a starting point, not as a guarantee of today’s yield or water quality. Official caveats include: data may not be accurate, complete, or legible; locations are only accurate to the nearest township, section, and range; and most reports are historical. A reported yield is what the driller recorded at construction, not a current pump test. The report will not tell you whether the water is safe to drink — that requires a laboratory test.
Search at the well report viewer (map or text). Text search can use owner name, address, county, depth, notice-of-intent number, completion date, well tag, well report ID, or tax parcel number. Southwest Region well-report tracking (the region that includes Pacific, Grays Harbor, Lewis, and Wahkiakum counties, among others) is listed on Ecology’s viewer contact section if you cannot find a report.
After the well is drilled
The NOI still is not permission to use the water. Confirm that the intended use fits a permit-exempt category under RCW 90.44.050 or that a water-right permit has been issued, and ask Ecology whether any watershed-specific limits apply. Then test the water before you drink it. DOH recommends at least annual coliform and nitrate tests; see Testing and treating well water.
Keep a copy of the well report, the well tag number if one was assigned, and the NOI number with your property records.
Gaps
- No official statewide schedule of typical per-foot or per-well construction prices was found on the Ecology or DOH pages used here. This page does not invent one.
- Ecology’s license search is a live query form. This site does not scrape it into a static county roster.
- Setback distances from septic systems and other features are set in well-construction and on-site sewage rules; this page does not reproduce a complete setback table. Confirm current distances in chapter 173-160 WAC and with the local health department.
Sources
- Ecology, Well construction notice of intent.
- Ecology, Well construction & licensing system and Licensed Driller Search.
- Ecology, Well report viewer; text search; search help.
- WAC 173-160-151 (Code Reviser PDF certified 2/20/2023).
- Washington L&I contractor registration lookup.